MSJC 5-Yr Capital Construction Plan/Res. #2010/11-045
August 13th, 2010FYI
The MSJC BOT approved the filing of the 2012-2016 Five Year Construction Plan with the State Chancellors Office on 8/12/10. The plan consists of twelve projects.
The San Gorgonio Pass - Permanent Facility with 42,014 ASF (assigned square feet) is listed for occupancy 2015/16 at a stated total cost of “$44,564,000 NonState funding”.
CPEC (California Post Secondary Education Commission) require a new campus project to reach 500 FTES (full-time equivalent students) and submit a comprehensive enrollment history/study before said project can be state approved and eligible to receive state capital outlay funds. This campus is totally dependent upon a local bond for all costs including mitigation costs for the extreme flood control issues on site.
See site pics above under “sidelines”.
http://www.cpec.ca.gov/completereports/2009reports/09-08.pdf



